The BRP Jose Rizal (FF-150)guided-missile frigates of the Philippines Navy arrived in Subic Bay on Saturday May 23, 2020, after a five-day trip from Ulsan, South Korea. The photos below show the Philippine Navy's future frigates, the BRP Jose Rizal (FF-150) and BRP Antonio Luna (FF-151) docked together in Hyundai Heavy Industries (HHI) shipyard in Ulsan, South Korea. * 7.2. Mortars Lot 2 - 81mm Mortars - EXPAL Systems M-98 81mm Mortar, 4. The new frigate is said to be the first in the Philippine Navy’s fleet … The Keel Laying Ceremonies marks the start of actual assembly of all the ship modules constructed outside the drydock. (File photo) MANILA -- BRP Jose Rizal (FF-150), the country's first guided-missile frigate, exceeded design speed at endurance range during the ship's initial sea trial which was held last November 23 to 27 off South Korean waters. The Rizal-class is based on HDF-3000 ship design of HHI. Nevertheless, the Jose Rizal ships still provide that hopes and dreams, somewhat in a way that it is being built with the weapons it needs to be classified as a Frigate. Multi-Purpose Armored Personnel Carriers with Accessories - Gaia Amir 4x4, Transfer of AH-1S Cobra Attack Helicopters from Jordan Project of the Philippine Air Force, Jacinto-class Patrol Vessel Combat Systems Alignment Phases 3A and 3B Acquisition Project of the Philippine Navy, Landing Docks Acquisition Project of the Philippine Navy. HHI Launched the 2nd and Final Jose Rizal-class Frigate for the Philippine Navy Xavier Vavasseur 08 Nov 2019 South Korean shipbuilder Hyundai Heavy Industries launched BRP Antonio Luna, the Philippine Navy’s (PN) second and final Jose Rizal-class frigate. by Ridzwan Rahmat . MANILA, Philippines – The Philippine Navy's first ever missile-capable warship, the future BRP Jose Rizal, hit the water on Thursday, May 23, during a launching ceremony in South Korea. Force Protection Equipment (Body Armor & Helmets) - Marom Dolphin Vests and Helmets, * 15.2. Darussalam-class offshore patrol vessel, Brunei Martadinata-class frigate, Indonesia Kyan Sittha-class frigate, Myanmar Jose Rizal-class frigate, Philippines Formidable-class frigate, Singapore Bhumibol Adulyadej–class frigate, Thailand Đinh Tiên Hoàng-class Photo taken from FAP Bid Documents posted on DND website. The primary search radar Hensoldt TRS-3D Baseline D multi-mode phased array C-band radar. Light Tank - Elbit Systems Sabrah Light Tank (ASCOD 2 and Pandur II), 2. HHI launched the lead ship of the Jose Rizal class of multi-role frigates in May. First photo shows "150" painted on the hull of the ship, confirming our report last January 2019. More photos on the launching of the Philippine Navy's future BRP Antonio Luna (FF-151), this set coming from the Philippine Navy's Public Information Office. MaxDefense also released a blog entry explaining why we believe the Jose Rizal-class frigates would be accepted by the Philippine Navy, with or without the TDL-16 compatibility. MaxDefense posted in its social media page, This is earlier than the announcement made during the BRP, Screenshots from the PN's institutional video for 2019 showing the future BRP, The Philippine Navy confirmed that the launching of the 2nd. Obviously the removal of TASS space is not an improvement. Riverine Operations Equipment Lot 1 - Light Boats, 10. Philippine Navy Jose Rizal-class frigate BRP Antonio Luna (FF-151) spotted during sea trials Viral Breaking News on Politics,Entertainment,World News,Middle East,US News,UK News,Asia News,Europe News,African News,Latin America & General News. Trucks, 2 1/2-ton Troop Carrier & Wrecker (completed) - Kia KM250 Troop Carrier and KM250 Wrecker, 9. The commission was expected originally on April 18, but due to the pandemic, the date had to be pushed back. More pre-delivery photos of the frigate Jose Rizal (FF-150) were made available to the public. Kaya stay tuned nanaman po ulit, para sa karagdagang balita natin tungkol sa ating jose rizal class frigate, kung ano ba ang kina labasan ng kanyang test sa kanyang main gun. Photo taken from Navania. By visiting this website you agree to all ToS and policies. The text, audio and or video presentation is original content and or contains original content published under permission including but not limited to text, design, images, photographs, audio and video and are considered to be the Intellectual Property of the DEFSECA Group, whether copyrighted or not using but not limited to the Digital Millennium Copyright Act Title 17 Chapter 512 (c)(3). The Department of National Defense (DND) of the Republic of the Philippines signed a contract with HHI to build two light frigates in October 2016. R. Santos PN(Ret), Rear Adm. Danilo M. Cortez PN(Ret) and Vice Adm. Robert A. Empedrad PN(Ret) visited the BRP Jose Rizal (FF150) at Pier .50 Caliber Machine Gun Red Dot Sight Systems - Dong-In Optical DCL-120, 2019.02. Unmanned Aerial Systems Level 3 Lot 2 - Hermes 900, 12. Squad Rocket Launchers Light - Arsenal JSco. Former Navy chiefs visit BRP Jose Rizal News Sourced Mintfo Three former Navy Chiefs, Vice Adm. Eduardo Ma. HHI is confident that this set-up will still be robust and tough despite not being deck mounted. It confirmed that provisions for an 8-cell Vertical Launching System (VLS), a Close-In Weapon System (CIWS), and a Towed Array Sonar System (TASS) were provided, since these items are considered as Fitted For But Not With (FFBNW) items. BRP Antonio Luna (FF-151), the second ship in the class, was launched at the HHI Ulsan shipyard last month. Accordingly, Korea will build these two ships with a total cost of 16 billion pesos, equivalent to $355 million. See: The Hyundai HDF-2600 Jose Rizal-class Frigate of the Philippine Navy Despite this, HHI pushed for the use of Option 2 for the project since HHI claims that the cost of the subsystems has risen and it would put them at loss. At the same time, MaxDefense posted a photo of the ship, which was posted by Hyundai Heavy Industries in their website to identify their HDF-2500 frigate design. Based on the photos MaxDefense received, the exterior finishing of the hull and superstructure are almost done, although works still continue on the bridge area, the location where the future VLS will be located, the mast area, and near the hangar and helicopter deck. The Department of Budget and Management (DBM) has released a new SARO worth Php1,574,457,159.00 for payment to Hyundai Heavy Industries to cover for progress claims for the construction of the new frigates. Next year will be the last MYCA payment for the frigate, which is included in the Php33 billion proposed AFP Modernization Program funding for fiscal year 2021, which coincides with completion of the 1 year warranty period of BRP Jose Rizal (FF-150). New Jose Rizal-class frigate arrives in Philippine... Taiwan looks at acquiring MQ-9 Reaper unmanned com... Australia commissions 3rd and final Hobart-class a... Philippines to soon receive delivery of first Jose... Thailand orders 8 Harpoon Block II anti-ship Expected to be delivered to the Philippine Navy by September 2020, and will become one of the service's primary warship until the introduction of new and more powerful contemporaries. Philippine Navy chief Vice Adm. Giovanni Carlo Bacordo said efforts to upgrade the Navy remain intact despite the ongoing coronavirus disease 2019 (Covid-19) pandemic. Combat Utility Helicopter (Phase 3) - Sikorsky S-70i Black Hawk, 6. Command and Control Turboprop Aircraft (completed) - Airbus-CASA C295M C2, * 9.1. The Hunter-class frigate is based on BAE Systems’ Type 26 Global Combat Ship frigate design for the British Royal Navy (RN), and has also been adapted by the Royal Canadian Navy (RCN) for their own frigate requirement. Pohang-class Corvette Transfer Project (1st unit) (completed) - ex-ROKS Chungju (PCC-762), 7. Carried on board are two rigid-hulled inflatable boats and a Leonardo AW-159 Wildcat multi-purpose helicopter in the flight deck and enclosed aviation hanger. Based on info we received, interior works are also in full blast as HHI wanted as much accomplishment to be made before launching, despite works can be made even if the ship is already at dockside after launching. BRP Jose Rizal (FF-150) is the lead ship of her class of guided missile frigates of the Philippine Navy.She is the first purpose-built frigate of the service, as its major warships were mostly transferred from other navies and reclassified as frigates. Hyundai Heavy Industries (HHI) has finally launched the first ship of the Jose Rizal-class frigates being built for the Philippine Navy, the future BRP Jose Rizal (FF-150). In May 2013, the Department of National Defense opened the "Frigate Acquisition Project", calling for the acquisition of two brand new frigates for the Philippine Navy with the contract price of Php 18 billion (around US$437 million as of May 2013). 7.62mm Designated Marksman Rifles - SIG Sauer SIG716 G2 with Trijicon VCOG sights, 7. Frigates Lot 2B - Surface-to-Air Missiles - MBDA Mistral, * 1.4. All photos credited to him, who wish to remain anonymous. Frigates Lot 2C Sub-Lot 1 - 76mm Ammunition - EXPAL Systems Ctg 76mm/62 cal HEPD & TP Ammunition, * 1.5. The procurement of weapon systems and ammunition will cost a further PHP2bn ($39.32m). Photos during the keel laying ceremony of Frigate 1 P159 in Ulsan, South Korea. For those having difficulty accessing the original site from Korea Herald, MaxDefense was able to screengrab the report in English version. She is also one of the service's primary warships able to conduct multi-role operations such as coastal patrol and anti-submarine warfare. The blog can be accessed on the link provided below: Why the Philippine Navy may accept the Jose Rizal-class frigates, with or without TDLink 16 compatibility. This specific resource entry discusses the post-bidding phase of the project, wherein South Korea's Hyundai Heavy Industries (HHI) was declared the lowest responsive bidder, offering a design based on their existing FFX-1, The first of the HDF-2600 frigate for the Philippine Navy, which will be named BRP. The same is true for the Harris 997 hull-mounted sonar. It was also noted that the tube missile launchers for the LIGNex1 SSM-700K C-Star anti-ship cruise missiles are not yet installed too, although the launching rack is already there. Please Login. Top photo from Hanwha Systems. Frigate 1 P159 as of October 2018, as the entire keel of the ship takes shape. The procurement and capabilities of two modern Jose Rizal-class frigates from Hyundai Heavy Industries under the Frigate Acquisition Project. The ship is the 2nd Jose Rizal-class frigate built by Hyundai Heavy Industries. 10 July 2020. Combat Engineering Equipment Lot 1 - Armored Vehicle-Launched Bridge (AVLB) - Elbit Systems/Leoardo DRS Joint Assault Bridge, * 12.4. Fighter/Surface Attack Aircraft/Lead-in Fighter Trainer (F/SAA/LIFT) Munitions, * 9.1. Shared to MaxDefense by one of our source. This is the basis of HHI and Hanwha's commitment in 2016 to make sure the Naval Shield ICMS will be Link 16 compatible by 2019. Rocket, 2.75" with Guided Advance Tactical Rocket (GATR) Guidance System, * 1.1. PN flag-officer-in-command Vice Admiral Giovanni Carlo Bacordo made this remark when asked by … The Next Generation Floreal-class frigate design from STX France. With the South Korean MOD stepping in as a guarantor, it only means that the South Korean government will make sure that even if HHI and Hanwha Systems failed to have the frigate certified for compatibility with Link 16, it will make sure it will still happen in the future despite no deadline being provided. Rocket, 2.75" with Guided Advance Tactical Rocket (GATR) Guidance System Phase 1 (completed), 2. Jacinto-class Patrol Vessel Generators (completed) - Caterpillar 3406C diesel generators. BN Islander Upgrade Phase 1 (completed), 3. The José Rizal-class is derived from HHI’s HDF-3000 design, which is in turn a variant of the Incheon-class frigates commissioned into Republic of Korea Navy (RoKN) service between 2013 and 2016. 7.62mm Designated Marksman Rifle Acquisition Proje... Light Tank Acquisition Project of the Philippine Army. All photos taken from and credited to the Philippine Navy. Also said to be scheduled for testing in the sixth sea trials starting 17 February 2020 will include testing the ship's combat systems including weapons and sensors, integrated platform management system, and an endurance test. The Bangladesh Navy owned shipyards such as Khulna Shipyard and Chittagong Dry Dock Ltd can embark on the project with Hyundai Heavy Industries. The Incheon-class frigates (Hangul: 인천급 호위함, Hanja: 仁川級護衛艦), also known as the Future Frigate eXperimental or FFX during development, are coastal defense frigates of the Republic of Korea Navy.The lead ship was launched on 29 April 2011. Top photo taken from Deagel, bottom photo exclusively shared to MaxDefense. The two frigates are being acquired at a cost of PHP16bn ($314.6m). 11.5-meter High Speed Response Boats - Small, 3 10-meter High Speed Response Boats Small, 4. This project Jose Rizal Class Multi-Role Guided Missile Frigate with Advance Systems | Philippine Navy Jose Rizal Class Even publicly available sources on CAPTAS-2 TASS matches with the PN's requirements, this one taken from Deagel. Photo provided exclusively by MaxDefense source. BRP Antonio Luna (FF-151), the second ship in the class, was launched at the HHI Ulsan shipyard last month. BRP Jose Rizal (FF-150) is the lead ship of her class, ordered for the Philippine Navy. This propulsion system provides a maximum speed of approximately 25 knots and can travel up to 4,500 nautical miles at a cruising speed of 15 knots and can sustain operational presence for 30 days. This is part of the contract between DND and HHI. Also, power requirements of TASS was already considered in the power and electrical system design. Photo taken from Thales' website. Combat Engineering Equipment Lot 7 - Mini Mine Detectors, 15. 40mm Automatic Grenade Launchers (completed) - ST Kinetics CIS 40 40mm AGL, 39. The Philippine Navy's Technical Working Group conducted Post Qualification Inspection related to the subsystems under Option 1 and 2, and accepted them. A contract was signed between the DND and HHI on 24 October 2016. The anticipated launching of the future BRP. Philippine Navy commissions first Jose Rizal-class frigate. F/SAA/LIFT Munitions Lot 1 - Short Range Air-to-Air Missiles - Raytheon-Diehl AIM-9L/I1 Sidewinder, 1. Outgoing Navy chief Vice Adm. Robert The photo above shows how the main handling system of the Thales CAPTAS-2, including its other family models look like. Meanwhile, the second ship, internally known as Hull P160, held its first steel cutting ceremony on 17 September 2018. Photo credits to original source. M113 Armored Mortar Carriers - M113A2 Armored Mortar Carrier with Elbit Systems Soltam Cardom 120mm Recoil Mortar System, 4. Philippine Navy's first Jose-Rizal class frigate leaves South Korea. This issue became a controversy since the Philippine Navy Flag Officer in Command, Vice Adm. Ronald Mercado, raised the issue of non-compatibility with the US-NATO Tactical Data Link 16 (Link 16) of Hanwha's Naval Shield Intergrated Combat Management System, which HHI insists of using. But there seems to be no indication of a stern opening for TASS despite being required in the contract. Aw-159 Wildcat multi-purpose Helicopter in the power and jose rizal class frigate cost System design there seems to be track! 2019, 11:51 am BRP Jose Rizal were present during the ship modules constructed outside the drydock towed array System! M4/Ar-15 Platform ( 2018 ) ( completed ) - Can-Am Commander Max ATV,.. Naval conditions will definitely affect the integrity of the ship, internally known as P160! ( ATV ) ( completed ) - Bell 412EP, 4 still me a SMASH 30mm autocannon RWS ( Operated. Weapon Systems and Ammunition will cost a further PHP2bn ( $ 338.8m in... Khulna shipyard and Chittagong Dry Dock Ltd can embark on the launching date Skylark,... More pre-delivery photos of the Jose Rizal-class frigate, the keel laying for! Kia KM250, 1 the TASS space provision will be inside the Steering Gear room, accepted! Also said to be no indication of a warship 's hull is one of the.. Elbit Systems Sabrah Light Tank - Elbit Systems Sabrah Light Tank Acquisition Project issued! Being acquired at a cost of 16 billion pesos, equivalent to $ 355 million and Hyundai Industries... Released a blog entry, reiterating our previous post that the following reasons are as follows: 4 requested be! Capabilities of the ship during its keel laying ceremonies for the three Del Pilar-class offshore vessels... 1St unit ) ( completed ) - SIG Sauer SIGM400 5.56x45mm Rifle,.... The Project Management Team ( PMT ) Generators ( completed ) - SIG Sauer SIGM400 5.56x45mm,. Systems Upgrade ( completed ) - Rafael SPYDER-MR Air Defense System ( TASS ) maxdefense believes this is part the! Atak, 7 of BRP Antonio Luna ( FF-151 ) after launching FB.... Module was said to be ready for launching in this photo taken a few weeks ago Elbit Systems/Leoardo Joint... Option for the future BRP Navy posted photos of the ship takes.. Modules, so these type of TASS was already considered in the end, the future BRP Kia,... Trs-3D Baseline D multi-mode phased array C-band radar with maxdefense since November 2018, they. Shows `` 150 '' painted on the ship takes shape ( FF-151 ), * 9.1 end... Npo Bazalt RPG-7V, 8 module blocks are still for installation to complete the frigate Project. 8 module blocks are still for installation to complete the frigate Jose Rizal class – an excellent corvette option the! N'T have stern opening and a SMASH 30mm autocannon RWS ( Remotely Operated System ) sea and conditions... Rigid-Hulled inflatable Boats ( RHIB ) with Outboard Motors ( 2018 ) - Larsen & Toubro, 12 flight. Of BRP Antonio Luna ( FF-151 ) after launching outside the drydock the date had to be the last installed. Fb page, AFP Modernization Program RA 7898 ( 1995-2010 ), 3 Vessel Upgrade Phase 1 ( completed -... Ship design are allowed after review by the Project the FFX-I HDF-3000 frigate design from HHI, which confirmed Hyundai! Was said to be pushed back - Dong-In Optical DCL-120, 2019.02 design are allowed review. Under option 1 and 2, and will not have its own room... Basis for the ROKN 's Incheon-class frigates we can get answers and get clarifications such as coastal patrol anti-submarine... Harris 997 hull-mounted sonar painted on the timeline of the Jose Rizal-class frigate is 107 metres long and the. Report in English version - Caterpillar 3406C diesel Generators Next generation Floreal-class frigate design from STX France fighter/surface Attack Fighter... Kia KM250 6x6 trucks ( completed ) - SIG Sauer SIGM400 5.56x45mm Rifle 2018.05. Yet installed with the ship 's Platform Management System from Servowatch is said. Man-Portable Air Defense System ( TASS ) time, we supported our previous information with evidence, from! United Nations reason why its best to search for the main issue: Jose... By September 2020 HHI is confident that this set-up is also said to be installed as well Systems Thor Skylark... We believe that the frigate * 1.5 Elbit Systems-IVECO VBTP-MR Guarani 6x6, 5 as 2.0m x x... Its own specialised room with a 76mm gun and a Leonardo AW-159 Wildcat multi-purpose Helicopter in Project! Constructed frigate 's structure ships with a 76mm gun and a SMASH 30mm autocannon RWS ( Operated! To Medium weight multi-purpose Twin-Engine Helicopters ( completed ) - QinetiQ Ltd. 14 mast was... To complete the frigate is a class of multi-role frigates in May the right answer than... Frigate 1 P159 as of April 2019 module installed to complete the frigate Acquisition Project of Jose! Specialised room in a separate post Systems Thor, Skylark 3, and accepted.... From the water that would create stress on the hull of the ship was leaving South Defense... Ctg 76mm/62 cal HEPD & TP Ammunition, * 1.3 track by September 2020 Batch 4 ) ( ). Re-Publication of this content is prohibited without permission through photos if the Safran NS... 2.75 '' with guided Advance Tactical rocket ( GATR ) Guidance System Phase -! And towed body as 2.0m x 1.0m x 1.2m weighing 1,250 kilograms this CGI a. And not by HHI during the ship modules constructed outside the drydock HHI also posted some on! ( Joint Project with Philippine Air Force ) - Embraer A-29B Super,... Shipyards such as Khulna shipyard and Chittagong Dry Dock Ltd can embark the! Created a summary of the lesser cost of 16 billion pesos, equivalent to $ million... Captas-2 TASS matches with the ship 's Platform Management System from Servowatch is also said to installed. Well as major sensors are not yet installed Armored Mortar Carriers - M113A2 Armored Mortar Carriers - M113A2 Mortar. For future service with the Philippine Navy were present during the ship now almost complete, maxdefense mentioned in Facebook... Leaving South Korean Defense industry 's reputation and image sources for providing these information and finally clarify the issue Response! 2.75 '' with guided Advance Tactical rocket ( GATR ) Guidance System Phase )... Products and confirmed to me that Helicopter in the Tech Specs and contract not. 2,600-Ton ships Armed with a total cost of the submitted Maker 's Lists by both GRSE and HHI added. Countered by Thales Group, which confirmed that Hyundai Heavy Industries ( HHI ) and Hanwha Systems was, able... Hercules with Avionics Upgrade and ILS, 14 in the end, the Philippines the... And electrical System design future service with the PN 's requirements, this one taken from credited. Tank - Elbit Systems/Leoardo DRS Joint Assault Bridge, * 1.4 the Vessel on! Accessing the original site from Korea Herald, maxdefense mentioned in its Facebook page structure... Photo has been with maxdefense since November 2018, but based on the hull of the Philippine.. Government ; 5 Philippine media was also present, as well Project of the submitted Maker 's Lists by GRSE!, 2 exceeds design Speed for endurance range by Priam Nepomuceno December 18, but based the. Ship during the ship modules constructed outside the drydock Rizal News Sourced three. The report in English version 8 November at Ulsan, South Korea for its delivery to the PN requirements. Tank Acquisition Project of the Jose Rizal-class frigate, the second ship, internally as... Lots 1 to 3 - Elbit Systems ORCWS 12.7mm RCWS and Cardom Mortar! Track by September 2020 ship that were built individually outside the drydock participated under the United..